Add TV screenshots and organize PassepartoutUITests with two test plans
for generating iOS/macOS (Main) and tvOS (TV) screenshots. Revert to the
.attachment destination and use `xcparse` to export the screenshots.
Change iPad screenshots to portrait.
Then autogenerate framed screenshots in two steps:
- Export the UITests screenshots per device (`export.sh`)
- Embed the results in a HTML/CSS template and take snapshots with
Chrome headless (`compose.sh`)
- Repeat for all devices (iPhone, iPad, Mac and Apple TV)
- Save framed screenshots to the `fastlane` screenshots directory
A bit of everything.
- Use GitHub handles in CHANGELOG
- Mention XOR patch in README and keywords
- Update gems
- Add GitHub issue template
- Fix missing script in release workflow
Might be the reason behind build hanging up in CI, arguably
waiting for a keychain password prompt.
Now, the issue never happened while prepping #207.
When testing the PR though, the testing step was omitted. This
drastically reduced the time between keychain creation and the
build to reach the codesigning phase. By restoring tests in
between, the increase in time would likely incur in keychain
auto-locking up.
- Convert action to keychain creation only
- Restore xcpretty as irrelevant (2a5c231)
* Do run tests in beta
- Test and build app in same lane
- Run tests with swift directly
- Set timeout on build only
- Set GYM_OUTPUT_DIRECTORY inline
- Fix bad build number, broken in db075eb
- Ignore updates to CHANGELOG for testing
- Drop unnecessary exports
- Drop unnecessary test env
- Drop unused PLATFORM .env.* variable
* Work around gym issues in CI
- Set custom build paths for proper clean-up
- Disable xcpretty (seems to hang job)
* Add descriptive names to workflow
- Rename beta to release
- Add job names
* Optimize release workflow
- Use a matrix for multiplatform build
- Only preinstall platform-specific certificates
- Output app version/build early for job reuse
- Do not depend app review on public beta release
- Pull latest commits before pushing/tagging
In release, ci/* scripts require Ruby. Make version an argument
of the commit-release.sh script to fix dependency.
* Import secret to notify external testers or not
* [ci skip] Add CHANGELOG preface in local scripts
* [ci skip] Update links to release via CI